Welcome to Foshan Co., Ltd. joint willy!
PVC floor before construction Tidbits

PVC floor before construction Tidbits

Floor requirements:
For the laying of success must be carefully check your current floor, ensure that the entire floor must be clean, smooth, hard, dry and free of cracks. For in terms of the different floor
1. cement: floor must be clean and not wet (if it is painted over the ground, to paint clear), all the cracks and holes should be first repaired. Referring to the German method of repairing TKB-8 standard.
2. Parquet: make sure that the existing floor clean and free of dust, glaze, wax, oil, cement and firmly on the ground, all the cracks and holes with a suitable filler (epoxy mortar) filled
3.RESILENT / Stone Sculpture Brick: remove all dirty with oil or wax on the floor, be sure to not lay on a soft plastic or rubber floor, this floor must be removed or covered with a layer of plywood, and all cracks and holes filled with a suitable filler.
Precautions:
Do not lay on the floor
On the ground is often hot
Ground temperature is too high or too low
Wood panels
Often damp places
Outdoor
Before laying the floor, placing them at room temperature for at least 24 hours.
layout :
(1) Before laying, check each felled bricks without damage
(2) If the back of the tiles with the arrow logo, make consistent direction of the arrow.
(3) from the center, such as (Figure 3) laying floor tiles, if the adhesive tiles, stripping out the back of the release paper and carefully placed in the position of the floor, and forced compaction; if not adhesive tiles, Please look for instructions on plastic buckets.
(4) Do not move once posted a good move, (in fact posted a good, if not destroyed after the tiles have been unable to move it).
Note: · release paper very slippery, please clofibrate place after peeling from the floor tiles to prevent people to set foot slipped.
Cutting:
- Brick cutting tool development, in the laying of the wall, and the remaining space is less than two felled space is more than a piece of brick tiles area (see Figure 4)
(1). Press the original step of placing a brick (do not tear release liner installation).
(2) Place a brick near the corner.
(3). In overlap with chalk marking the tiles out with a utility knife cut.
(4) Press the previous steps to install.
Maintenance fold
For dirt, use a broom, mop or vacuum cleaner wet wipe.
Disable corrosive cleaners.
Furniture leg is appropriate (such as pads, sets, etc.) protection.
Often adapted Stone Sculpture tiles tool to clean the floor.

Hot List
Similar articles Top
News articles
Your browsing history

20014-2020 Foshan joint Huili Flooring Co., Ltd [GuangDong ICP No. 15062873 -1]
Phone: +86 0757-81992001 / 81992002 VIP Line: 13760998988
Fax: +86 0757-66811911 E-mail: xurongmin001@yahoo.com.cn Website: www.lhfloor.com
Address: Nanhai District of Foshan City Luocun Foshan airport entrance on Union
Main products: PVC flooring | Plastic flooring | sports flooring | Rubber flooring | Stone Sculpture flooring